Project Size 11,000
Project Cost $1.7M
Projected Schedule 5 months
Actual Schedule 5 months
Built in the 1950’s for heavy industrial use, the Copper Cliff refinery presented a unique set of challenges to the design and construction team. Through the use of creative thinking and sound construction methodologies, Polestar was able to take a bold new approach to engineering office space within the Vale community and far exceed branding expectations. Existing facility maintained full operation through a phased construction approach.